On-Demand Webinar · Food Safety Magazine Panel
FSMA 204 in Practice: Building a Traceability-Ready Operation
Thanks for registering. Watch the full panel below on turning FSMA 204 traceability requirements into daily workflows, then use the tools underneath to see where your own operation stands.
What You'll Take Away
- How CTEs, KDEs, and Traceability Lot Codes apply to real activities across growing, processing, and distribution, not just on paper.
- How to check whether your records are complete, connected, searchable, and ready to support a 24-hour FDA request.
- Where traceability breaks down between suppliers, customers, third parties, and internal teams, and how to close those gaps before an issue forces the question.
- How to move from fragmented records across systems, spreadsheets, and paper toward a defensible approach to recall response and FDA reporting.
The Panel
Kevin Donaghy
Chief Innovation Officer, Quality & Compliance
Nulogy
Joe Buckley, M.B.A.
Director, Food Safety and Quality Assurance
Sysco Corporation
Bill Bremer
Food & Beverage Regulatory Consultant
Independent
Adrienne Blume, M.A.
Editorial Director (Moderator)
Food Safety Magazine
Now Put It to Work
You have the framework. Here is how to pressure-test your own operation against a 24-hour FDA request before 2028 makes it urgent.
Assess
FSMA 204 Recall Readiness Gap Analysis
36 items across 6 areas. Score your current state and leave with a 90-day action plan.
Go Deeper
FSMA 204 Resource Hub
Guides, the compliance package, and expert insight to build a traceability-ready operation.
See It Work
Nulogy FSMA 204 Traceability
Capture CTEs and KDEs in existing workflows and produce FDA-ready records in under 24 hours.
FSMA 204 compliance deadline: July 20, 2028. The operational work takes 18 to 36 months. Starting now is on time.
Free Download
Download Resource
From Farm to Fork: FSMA 204 Traceability Across Your Network
A presentation-ready deck covering FSMA 204 requirements, CTE and KDE obligations, and how to build a traceability-ready operation before the 2028 deadline.
FSMA 204 Recall Readiness Gap Analysis
36 assessment statements across 6 critical areas. Score your current state, identify the gaps that matter most, and build a 90-day action plan before an FDA request surfaces them first.
From Farm to Fork: Building True End-to-End Traceability Under FSMA 204
A comprehensive guide to FDA food traceability regulations and how Nulogy helps organizations across the food supply chain build compliant, future-ready operations.