Free Guide

Breaking the Black Box: Why Connected Planning is Critical for Brands

Most brands plan external manufacturing with incomplete data. This visual guide shows what changes when your ERP and APS are enriched with real-time data from your external manufacturing partners.

Format: Visual Guide
Covers: Planning Before and After Connected Planning

Get the Free Guide

Download the guide and see where connected planning fits in your external manufacturing strategy.

What's Inside

Why external manufacturing still feels like a black box

Brand planners turn inventory counts, schedules and order data into supply plans, and those plans are only as good as the data behind them. When external manufacturing (EM) networks operate as black boxes, plans built on internal data alone go out of date almost as fast as they are made, and late or missed orders put trust, reputation and revenue at risk.

This visual guide compares planning before and after connected planning, where your ERP and Advanced Planning System (APS) are enriched with real-time data from external partners. Download the guide, then see how Nulogy Supplier Collaboration connects your planning system to real-time capacity, inventory and production status from your co-packers and contract manufacturers.

"A platform like Nulogy allows us to connect with any external manufacturer no matter what their capabilities are, and feed well-defined data sets into our concurrent planning tool." Global Planning Executive, Fortune 500 CPG

Hand on a laptop over a night map marked with location pins

The black box, by the numbers

Up to 30%
Of a brand owner's output is outsourced to external manufacturers, according to Supply Chain Insights
8%
Of supply chain leaders felt they had a clear, data-driven picture of internal and external supply chain conditions, in a Gartner survey
23%
More profitable: companies with the most mature supply chains vs. their peers, in an Accenture analysis of 1,100+ organizations
200 bps
Service level improvement reported by a global CPG demand planning director after collaborating more closely in planning
Inside the Guide

What the guide walks through

The guide's four sections, from the planning problem to what connected planning makes possible.

01

Your Black Box Planning Dilemma

Why brands struggle to build realistic, actionable supply plans when their external manufacturing networks are a black box, and most brand owners and contract manufacturers still communicate through email and spreadsheets.

02

Life Before Connected Planning

What happens when an APS relies on internal data alone: disconnected planning processes, limited visibility beyond your four walls, and no real-time order, capacity or traceability data from partners.

03

Life With Connected Planning

How enriching your ERP and APS with real-time partner data gives a complete picture of the end-to-end supply chain, with live order and in-transit inventory updates and more accurate supply plans.

04

Solving the Black Box Dilemma

How connected planning moves brands from reacting to disruptions to collaborating with partners for greater responsiveness, order accuracy and reliability.

Common Questions

Breaking the Black Box FAQ

1What does the guide cover?

Why external manufacturing networks are a black box for brand planners, what planning looks like before connected planning, and the benefits of connected planning: real-time updates on orders in progress and inventory in transit, greater responsiveness to demand shifts, more accurate supply planning data, and stronger relationships with strategic suppliers.

2Who is this guide for?

Supply chain planners, demand planners and external manufacturing leaders at brands that rely on co-packers and contract manufacturers for part of their production.

3What is connected planning?

Connected planning enriches a brand's ERP and APS with real-time data from external partners, such as order status, capacity and inventory in transit. Planners get a complete picture of the end-to-end supply chain instead of relying on internal data alone.

4What is an APS?

An Advanced Planning System (APS) is software brands use as their system of record for supply planning and order planning. An APS is only as accurate as the data it receives, which is why missing EM data creates risk.

5How does Nulogy Supplier Collaboration support connected planning?

Nulogy Supplier Collaboration connects a brand's planning system to real-time capacity, inventory and production status across every partner, and supplier commitments flow into planning platforms like Kinaxis Maestro. Suppliers don't need to buy new software, and planners keep their existing planning tool.

See Nulogy Supplier Collaboration in Action

Talk to our team about connecting your planning system to your external manufacturers.

  • Real-time capacity, inventory and production status across partners
  • Supplier commitments flow into planning platforms like Kinaxis Maestro
  • Suppliers don't need to buy new software
Book Your Demo