Case Study

Oral Biotech

Oral Biotech

Customer Story

Oral Biotech

After struggling with an inadequate monitoring system, Oral Biotech moved to Nulogy Smart Factory for real-time production data, raising OEE on one line from about 60% to about 80% and cutting scrap and rework.

IndustryDental Technology
SolutionNulogy Smart Factory
RegionOregon, United States
Download the Case Study
About Oral Biotech

Oral Biotech is a dental technology company based in Albany, Oregon, specializing in oral health care products. Its focus on research and development aims to improve dental practices and patient outcomes.


The Challenge

Short stops nobody was counting

Oral Biotech relied heavily on hourly manual reporting that did not capture short stops during production. The team had no way of knowing how much those stops were holding back production efficiency.

Its previous monitoring software was also hard to work with, with wired hardware that had to be plugged in across the plant.

“
Before, we were running close to 60% OEE on one of our lines, and now, we’re up close to 80% OEE.
John Bowers, Director of Product Management, Oral Biotech
The Results

Outcomes

With digital displays throughout the plant and sensors on the lines, Oral Biotech gained real-time transparency and freed its teams for value-added work.

Real-Time Data Visibility

Manual records left blind spots that no one could fill from memory. Real-time data from Smart Factory lets staff get in front of production problems as they happen.

Higher OEE, Less Scrap

OEE on one line rose from close to 60% to close to 80%. Scrap and rework, which used to average 2% to 3%, are down to one or two units in total.

Accessible, Automated Reporting

Smart Factory integrates with Oral Biotech’s NetSuite ERP, and wireless sensors replaced the wired setup of its previous software.

See Nulogy Smart Factory in Action

Talk to our team about measuring every stop on your lines, the way Oral Biotech did.

Related Content

Glowcroft Contract Packing production floor

Glowcroft Contract Packing

Glowcroft chose Nulogy Shop Floor to digitise its contract packing operations for greater control, visibility and opportunities for growth.

Prism eLogistics

Prism eLogistics

See how Prism eLogistics went live on Nulogy Shop Floor in under 30 days and cut product recall reporting time by 96%, from 9 hours to 20 minutes.

Versatech manufacturing

Versatech

See how Versatech replaced paper tracking and spreadsheets with Nulogy Smart Factory, raising OEE by 30% and achieving ROI within three months.

Ready to learn more?

See how Nulogy can reduce costs and drive profitability for your business.