A six-step roadmap for raising overall equipment effectiveness: start from a real-time baseline, make performance visible on the floor, and keep the gains going.
Download the guide and plan how your plant will raise OEE.
Most plants know their OEE could be higher. Fewer know where the losses actually are, or how to get every shift working on the same number. This guide shows how manufacturers reliably raise overall equipment effectiveness, and why the production monitoring tool you choose matters as much as the targets you set.
It covers six steps, from building a real-time OEE baseline to setting new operational targets once you hit the old ones. Download the guide to see how each step builds a data-driven culture on the floor, then see how Nulogy Smart Factory measures OEE live by line and shift.
Want to check your own numbers first? Try our OEE calculator.
The order the guide recommends, from measuring where you are to raising the bar once you get there.
Use real-time production monitoring to measure where OEE stands today, so every improvement is measured against a real number instead of an estimate.
Put live performance where operators and supervisors can see it, so problems surface while there is still time to act.
Show every team member what OEE improvement means for the plant and for their own work, so the number matters on every shift.
Make hitting target the shared goal, so lines in the red get attention fast and lines in the green set the standard.
Review yesterday's performance every day, assign the follow-up, and keep the conversation grounded in data.
Once a target becomes routine, raise it. Continuous improvement means the baseline keeps moving.
Six steps to raising OEE: creating a real-time OEE baseline, using visual factory management, communicating the value of OEE improvement, building a culture of getting to green, following up with daily production meetings, and continually setting new operational targets.
Plant managers, operations leaders and continuous improvement teams who want to raise OEE and keep the gains, whether you track performance on paper and spreadsheets today or already have some machine data.
Overall equipment effectiveness measures how much of a machine's planned production time turns into good parts. OEE multiplies availability, performance and quality. Read the full explanation in our OEE calculator guide.
Because manual tracking misses short stops and slow running, which makes OEE look better than it is. A baseline built from live machine data shows where the losses actually are, so improvement work targets the right line.
H&T Waterbury cut micro-stoppages by 71% and eliminated nine hours of weekly downtime with Nulogy Smart Factory, and most Smart Factory customers see a 10 to 20% OEE increase in their first year.
Enter one shift's numbers to see your OEE and which factor is costing you the most.
Try the calculator → Free GuideHow to get live machine data off your floor, from the first problem to the full plant.
Get the guide → Case StudyHow one plant found out its micro-stoppage problem was bigger than anyone thought, and fixed it.
Read the story →Estimate what production monitoring could return for your plant with the Smart Factory ROI calculator.
Talk to our team about building a real-time OEE baseline for your plant.