Case Study

H&T Waterbury

H&T Waterbury

Customer Story

H&T Waterbury

H&T Waterbury replaced manual data entry with Nulogy Smart Factory, reducing micro stoppages by 71% and eliminating nine hours of downtime a week.

IndustryPrecision Metal Components
SolutionNulogy Smart Factory
RegionUnited States
Download the Case Study
About H&T Waterbury

H&T Waterbury is part of the Heitkamp & Thumann Group. Established in 1978, the group is a leading global partner for the development and supply of precision formed components, devices and services.


The Challenge

Small stops, invisible losses

Micro stoppages are common in high-volume, high-speed facilities, as operators make small adjustments to keep lines moving. With pencil and paper, there was no way to measure how much those stops added up to in unplanned downtime.

Manual data entry also introduced errors, and the team could not see how downtime and machine stops were affecting the bottom line.

“
Smart Factory helped us realize that our small micro stoppage problem was actually a bigger problem than we anticipated.
Matt Hill, Operations Improvement Coordinator, H&T Waterbury
The Results

Outcomes

With real-time data from the floor, H&T Waterbury reduced micro stoppages by 71% and built a culture of continuous improvement.

Automated Data Collection

Automatic data collection replaced manual entry, removing errors and freeing time for value-added work. The team now finds, diagnoses and solves problems quickly.

71% Fewer Micro Stoppages

Real-time data helped the team fix the small problems behind micro stoppages, reducing them by 71% and eliminating nine hours of downtime a week.

Visibility for Everyone

Management receives a production report at the end of every day and a weekly report after the Saturday shift, keeping everyone in the loop and building a culture of communication and teamwork.

Continuous Improvement That Sticks

Alerts help the team monitor corrective actions over time, matching current trends with historical data to confirm what is working.

See Nulogy Smart Factory in Action

Talk to our team about finding the hidden losses on your floor, the way H&T Waterbury did.

Related Content

Glowcroft Contract Packing production floor

Glowcroft Contract Packing

Glowcroft chose Nulogy Shop Floor to digitise its contract packing operations for greater control, visibility and opportunities for growth.

Prism eLogistics

Prism eLogistics

See how Prism eLogistics went live on Nulogy Shop Floor in under 30 days and cut product recall reporting time by 96%, from 9 hours to 20 minutes.

Versatech manufacturing

Versatech

See how Versatech replaced paper tracking and spreadsheets with Nulogy Smart Factory, raising OEE by 30% and achieving ROI within three months.

Ready to learn more?

See how Nulogy can reduce costs and drive profitability for your business.