Kuehne + Nagel Geel
Kuehne + Nagel Geel replaced manual processes and three separate systems with Nulogy Shop Floor, gaining a live view of production and cutting data analysis follow-up by 62%.
Founded in 1890, Kuehne + Nagel is a leading global logistics provider with more than 78,000 employees in over 100 countries. Its site in Geel, Belgium, which is also its headquarters for Belgium and Luxembourg, provides logistics and value-added services for high-tech clients such as printer and electronics manufacturers, and joined several European K+N sites already using Nulogy.
Three systems, estimates and manual rework
Site data was spread across three separate systems, which meant time-consuming workflows and data reconciliation. Inventory tracking relied on estimates instead of a live view of production.
Quality audits were manual and slow, and rework in the Customization department was a manual, multi-step process prone to errors.
Kuehne + Nagel Geel on working with Nulogy
Nulogy helped us improve management of our rework flow, cut down on manual work, improve the speed of data analysis, and allowed us to cut down on paper waste.
Outcomes
With Nulogy, Geel cut follow-up work, eliminated data errors and gave customers more visibility into their projects.
62% Less Data Analysis Follow-Up
The administration department cut data analysis follow-up by 62%, and data errors were eliminated in multiple departments.
A Live View of Production
Real-time production data in Shop Floor made planning and scheduling more efficient and gave Geel accurate inventory consumption data.
Faster, More Accurate Quality Reporting
Automated steps replaced manual processes in the Quality & Repairs department, greatly increasing reporting speed and accuracy.
A Customer Portal
Customers see their projects in a portal, replacing long email chains.
More Customer Stories
Kuehne + Nagel Netherlands
Kuehne + Nagel Netherlands cut RFQ and recall response times by 50%.
Read the story →Case StudyCEVA Logistics Turkey
CEVA rolled out Nulogy Shop Floor to four Turkey co-pack sites in 12 months, improving performance at every site.
Read the story →Case StudyPrism eLogistics
Prism eLogistics cut recall reporting time by 96% with Nulogy Shop Floor.
Read the story →Want more customer stories?
Browse the full library of Nulogy case studies.
See Nulogy Shop Floor in Action
Talk to our team about automating value-added services, the way Kuehne + Nagel Geel did.