Case Study

Tacony

Tacony

Customer Story

Tacony

Tacony used Nulogy Smart Factory to get the production data its West Chicago furniture plant was missing, cutting a 14-week order backlog to less than six weeks.

IndustryConsumer Products
SolutionNulogy Smart Factory
RegionUnited States
Download the Case Study
About Tacony

Founded in 1946 and based in Missouri, Tacony is a family-owned manufacturer and distributor of products and solutions for sewing, cleaning, furniture and home care.


The Challenge

A 14-week backlog and no data to fix it

Tacony’s West Chicago furniture plant was wrestling with a 14-week order backlog caused by production inefficiencies, representing hundreds of thousands of dollars in unrealized revenue.

The plant had no clear view of its production metrics, and no data to show what had to change to produce enough output to clear the backlog.

“
Smart Factory has been transformative in an accountability and transparency standpoint. It’s a tool that allows us to improve, rather than a tool for discipline or poking holes in what’s not going right.
Nick Hinman, VP of Corporate Strategy, Tacony
The Results

Outcomes

Within months, the West Chicago plant cut its order backlog from 14 weeks to less than six, realizing approximately $500,000 in order revenue.

Real-Time Production Reporting

Tacony collects and reports production data in real time with Smart Factory. Leaders get the previous day’s performance by email at 6 am and know exactly where to focus.

Order Visibility Through to the Warehouse

Tacony now sees how efficiently product moves through the plant to the warehouse, and on to customers, which it never had before.

Operators in Control of Their Shift

Visual scoreboards on the plant floor let operators track their own progress at a glance and measure and control their output through each shift.

See Nulogy Smart Factory in Action

Talk to our team about using production data to clear your backlog, the way Tacony did.

Related Content

Glowcroft Contract Packing production floor

Glowcroft Contract Packing

Glowcroft chose Nulogy Shop Floor to digitise its contract packing operations for greater control, visibility and opportunities for growth.

Prism eLogistics

Prism eLogistics

See how Prism eLogistics went live on Nulogy Shop Floor in under 30 days and cut product recall reporting time by 96%, from 9 hours to 20 minutes.

Versatech manufacturing

Versatech

See how Versatech replaced paper tracking and spreadsheets with Nulogy Smart Factory, raising OEE by 30% and achieving ROI within three months.

Ready to learn more?

See how Nulogy can reduce costs and drive profitability for your business.