Estudio de caso

LetsGetChecked

LetsGetChecked

Historia de un cliente

LetsGetChecked

LetsGetChecked replaced a production monitoring system that fell short with Nulogy Smart Factory, improving cycle times by 13% at its Dublin facility.

IndustryHealth & Life Sciences
SolutionNulogy Smart Factory
RegionDublin, Ireland
Descargar el estudio de caso
Acerca de LetsGetChecked

Founded in 2015, LetsGetChecked is a global healthcare solutions company that helps people manage their health from home, with health testing, genetic sequencing, virtual care and medication delivery. Its model spans manufacturing, logistics, lab analysis, physician support and prescription fulfillment.


El desafío

A monitoring system that did not deliver

The LetsGetChecked team in Ireland had adopted a production monitoring system that ultimately produced inadequate results. Each health testing kit has its own cycle time and assembly process, and the team lacked the real-time data to see how lines were really performing.

LetsGetChecked needed complete, real-time visibility into plant performance, with insights its teams could use to improve production and fulfillment.

"
[Smart Factory] has given us a clear picture on how the downtime is influencing the production of kits, as well as how our operators factor into overall performance.
Rahul Alagusundaram, Production Planner, LetsGetChecked
The Results

Resultados

With actual cycle time and downtime data from every line, LetsGetChecked improved cycle times by 13% and keeps finding new improvements.

Better Production Processes

Teams see actual cycle time data during production in Smart Factory and have used it over two years to make incremental process improvements across a wide range of kits.

Smarter Downtime Analysis

Visual factory scoreboards show whether production is ahead of or behind schedule. Staff identify issues, attribute them correctly, and act on downtime causes faster.

Stronger Cross-Team Collaboration

Data from Smart Factory now supports departments across the facility, not just the plant floor, including demand planning and capacity analysis.

Descubre la fábrica inteligente de Nulogy en acción

Talk to our team about real-time cycle time and downtime data, the way LetsGetChecked did.

Contenido relacionado

Planta de producción de Glowcroft Contract Packing

Glowcroft: Envasado por encargo

Glowcroft eligió a Nulogy Shop Floor para digitalizar sus operaciones de envasado por encargo con el fin de lograr un mayor control, visibilidad y oportunidades de crecimiento.

Prisma eLogística

Prisma eLogística

See how Prism eLogistics went live on Nulogy Shop Floor in under 30 days and cut product recall reporting time by 96%, from 9 hours to 20 minutes.

Fabricación Versatech

Versatech

See how Versatech replaced paper tracking and spreadsheets with Nulogy Smart Factory, raising OEE by 30% and achieving ROI within three months.

¿Quiere saber más?

Vea cómo Nulogy puede reducir costes e impulsar la rentabilidad de su empresa.