Estudio de caso

Versatech

Versatech

Historia de un cliente

Versatech

Versatech replaced paper tracking and spreadsheets with Nulogy Smart Factory, raising OEE by 30% and achieving ROI within three months.

IndustryAutomation & Manufacturing
SolutionNulogy Smart Factory
RegionIllinois, United States
Descargar el estudio de caso
About Versatech

Based in Illinois, Versatech provides manufacturing and engineering services in robotics, automation, workholding with hydraulic integration, contract manufacturing, job shop prototyping and low-volume runs, and lean manufacturing consulting.


El desafío

Paper tracking that could not keep up

Versatech tracked production on paper and spreadsheets that were time-consuming to update and maintain. Teams had no real-time production data to act on, reporting was manual, and data accuracy suffered.

The company needed a production monitoring system that would give quality, engineering, maintenance and production teams live data, so they could reduce overtime, cut downtime and improve machine utilization.

"
We wanted to get off our paper system. We hoped that Smart Factory could help us collect data into a central database to improve the way we worked and that’s exactly what Smart Factory did.
Chad Hill, CEO, Versatech
The Results

Resultados

After switching to Smart Factory, Versatech raised OEE by 30% and achieved ROI in less than three months.

Better Plant Floor Visibility

Real-time data in one tracking system gives quality, engineering, maintenance and production teams the same view of the floor, so they can act on overtime, downtime and machine utilization.

Less Downtime

Versatech correlates unscheduled downtime with specific events, so issues get solved quickly and negative trends are caught early. Automated reporting saves the team hours.

Lower Labor and Scrap Costs

Real-time visibility and a faster tracking workflow help Versatech spot rising scrap rates as they happen, preventing several major cost drivers.

Descubre la fábrica inteligente de Nulogy en acción

Talk to our team about real-time production monitoring, the way Versatech did.

Contenido relacionado

Planta de producción de Glowcroft Contract Packing

Glowcroft: Envasado por encargo

Glowcroft eligió a Nulogy Shop Floor para digitalizar sus operaciones de envasado por encargo con el fin de lograr un mayor control, visibilidad y oportunidades de crecimiento.

Prisma eLogística

Prisma eLogística

See how Prism eLogistics went live on Nulogy Shop Floor in under 30 days and cut product recall reporting time by 96%, from 9 hours to 20 minutes.

Planta de fabricación de Tacony

Tacony

See how Tacony used Nulogy Smart Factory to get real-time production data at its West Chicago plant and cut a 14-week order backlog to under six weeks.

¿Quiere saber más?

Vea cómo Nulogy puede reducir costes e impulsar la rentabilidad de su empresa.